Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Kia sports coupe concept

Wed, 18 Jul 2007

By Tim Pollard First Official Pictures 18 July 2007 09:15 Kia sports coupe concept: the first glimpse Do you detect hints of Audi TT about this low-slung sports car concept? Maybe you should, because it’s the shape of Kias to come and was designed by Peter Schreyer, the Koreans’ new design director and former head of design at Audi. It’s being hailed as a landmark car for Kia, and we’d say that for once the PR puff is spot-on.

Porsche Museum hosts Colección Goméz

Tue, 20 Sep 2011

The Porsche Design Museum is opening a new special exhibition today, September 20th. Called the ‘Colección Goméz' the museum will display 24 works of art created by 19 South American artists who have used Porsche 911 GT2 hoods pressed into service as a ‘canvass'. The new exhibition is the brainchild of Jorge Gómez, both an art lover and big fan of the Porsche brand.

Honda cuts UK production by 50 per cent

Wed, 06 Apr 2011

Honda (UK) cuts production Japan is slowly recovering from the earthquake and tsunami that hit on 11th March. Or at least its production is. Honda has revealed that it expects its Japanese plants to resume production of 11th April – just one month after the disaster – but initially that will be at just 50% capacity due to a shaky parts supply line.